US Bridges

SH 130 NB Ml over Pflugerville Pkwy

Good

Travis County, Texas · 1.50 MI S of SH 45 · Structure no. 142270044006064

Built
2006
19 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
306 ft
3 main spans
Daily traffic
6,750
2016 count
Owner
State
State Highway Agency

About this bridge

SH 130 NB Ml over Pflugerville Pkwy is a prestressed concrete stringer/multi-beam or girder carrying SH 130 NB Ml over Pflugerville Pkwy in Travis County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,750 vehicles a day, roughly 15% of them trucks, projected to reach 20,477 by 2036. The structure is 306 ft (93.3 m) long and 70 ft wide.

CarriesSH 130 NB Ml
CrossesPflugerville Pkwy
Location1.50 MI S of SH 45
StateTexas
Coordinates30.45184, -97.59398
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 25 or greater
Structure length306 ft (93.3 m)
Longest span118 ft (36 m)
Deck width70 ft (21.3 m)
Roadway width68 ft (20.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,750 (2016)
Projected traffic20,477 by 2036
Trucks15%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 130 NB Ml over Pflugerville Pkwy built?

It was built in 2006, making it 19 years old in 2025.

What condition is SH 130 NB Ml over Pflugerville Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does SH 130 NB Ml over Pflugerville Pkwy carry?

About 6,750 vehicles per day (2016 count), of which roughly 15% are trucks.

How long is SH 130 NB Ml over Pflugerville Pkwy?

The structure is 306 ft (93.3 m) long with a longest span of 118 ft (36 m) and a deck 70 ft wide.

Who owns SH 130 NB Ml over Pflugerville Pkwy?

It is owned by the State Highway Agency.