US Bridges

7th ST to US 183SB over 1st St(cesar Chavez)

Good

Travis County, Texas · 0.2 MI W of US 183 · Structure no. 142270015106509

Built
2018
7 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
365 ft
3 main spans
Daily traffic
5,000
2018 count
Owner
State
State Highway Agency

About this bridge

7th ST to US 183SB over 1st St(cesar Chavez) is a prestressed concrete stringer/multi-beam or girder carrying 7th ST to US 183SB over 1st St(cesar Chavez) in Travis County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 4% of them trucks, projected to reach 1 by 1900. The structure is 365 ft (111.3 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries7th ST to US 183SB
Crosses1st St(cesar Chavez)
Location0.2 MI W of US 183
RouteU.S. Route 183
StateTexas
Coordinates30.25118, -97.69407
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length365 ft (111.3 m)
Longest span130 ft (39.6 m)
Deck width38 ft (11.7 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2018)
Projected traffic1 by 1900
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 7th ST to US 183SB over 1st St(cesar Chavez) built?

It was built in 2018, making it 7 years old in 2025.

What condition is 7th ST to US 183SB over 1st St(cesar Chavez) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does 7th ST to US 183SB over 1st St(cesar Chavez) carry?

About 5,000 vehicles per day (2018 count), of which roughly 4% are trucks.

How long is 7th ST to US 183SB over 1st St(cesar Chavez)?

The structure is 365 ft (111.3 m) long with a longest span of 130 ft (39.6 m) and a deck 38 ft wide.

Who owns 7th ST to US 183SB over 1st St(cesar Chavez)?

It is owned by the State Highway Agency and maintained by the Local Toll Authority.