SH130NB to US290WB over SH 130 and US 290E
GoodTravis County, Texas · 0.8 MI S of E Palmer LN · Structure no. 142270011402491
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 5,645 ft
- 6 main spans
- Daily traffic
- 2,150
- 2020 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
SH130NB to US290WB over SH 130 and US 290E is a steel continuous stringer/multi-beam or girder carrying SH130NB to US290WB over SH 130 and US 290E in Travis County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,150 vehicles a day, roughly 5% of them trucks, projected to reach 6,429 by 2040. The structure is 5,645 ft (1,720.6 m) long and 71 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH130NB to US290WB over SH 130 and US 290E built?
It was built in 2020, making it 5 years old in 2025.
What condition is SH130NB to US290WB over SH 130 and US 290E in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does SH130NB to US290WB over SH 130 and US 290E carry?
About 2,150 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is SH130NB to US290WB over SH 130 and US 290E?
The structure is 5,645 ft (1,720.6 m) long with a longest span of 225 ft (68.6 m) and a deck 71 ft wide.
Who owns SH130NB to US290WB over SH 130 and US 290E?
It is owned by the Local Toll Authority.