US Bridges

US 290 EB Exit Rmp over US 290 EB on Ramp

Good

Travis County, Texas · 0.05 M E of Indust Oaks · Structure no. 142270011309208

Built
1999
26 years old
Condition
Good
inspected August 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
430 ft
4 main spans
Daily traffic
5,303
2015 count
Owner
State
State Highway Agency

About this bridge

US 290 EB Exit Rmp over US 290 EB on Ramp is a prestressed concrete stringer/multi-beam or girder carrying US 290 EB Exit Rmp over US 290 EB on Ramp in Travis County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,303 vehicles a day, roughly 4% of them trucks, projected to reach 6,390 by 2035. The structure is 430 ft (131.1 m) long and 26 ft wide.

CarriesUS 290 EB Exit Rmp
CrossesUS 290 EB on Ramp
Location0.05 M E of Indust Oaks
RouteU.S. Route 290
StateTexas
Coordinates30.23626, -97.83782
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length430 ft (131.1 m)
Longest span120 ft (36.6 m)
Deck width26 ft (7.9 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,303 (2015)
Projected traffic6,390 by 2035
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 290 EB Exit Rmp over US 290 EB on Ramp built?

It was built in 1999, making it 26 years old in 2025.

What condition is US 290 EB Exit Rmp over US 290 EB on Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.

How much traffic does US 290 EB Exit Rmp over US 290 EB on Ramp carry?

About 5,303 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is US 290 EB Exit Rmp over US 290 EB on Ramp?

The structure is 430 ft (131.1 m) long with a longest span of 120 ft (36.6 m) and a deck 26 ft wide.

Who owns US 290 EB Exit Rmp over US 290 EB on Ramp?

It is owned by the State Highway Agency.