US Bridges

US 290 Wbml over William Cannon Dr; Willi

Good

Travis County, Texas · 0.2 Mi. S. of SH 71 · Structure no. 142270011308497

Built
2025
0 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
3,956 ft
28 main spans
Daily traffic
83,327
2023 count
Owner
State
State Highway Agency

About this bridge

US 290 Wbml over William Cannon Dr; Willi is a prestressed concrete stringer/multi-beam or girder carrying US 290 Wbml over William Cannon Dr; Willi in Travis County, Texas. It was built in 2025, so it is 0 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 83,327 vehicles a day, roughly 4% of them trucks, projected to reach 114,991 by 2042. The structure is 3,956 ft (1,205.7 m) long and 58 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesUS 290 Wbml
CrossesWilliam Cannon Dr; Willi
Location0.2 Mi. S. of SH 71
RouteU.S. Route 290
StateTexas
Coordinates30.2345, -97.87126
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans28 (+10 approach)
Design loadHL 93
Structure length3,956 ft (1,205.7 m)
Longest span133 ft (40.4 m)
Deck width58 ft (17.7 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic83,327 (2023)
Projected traffic114,991 by 2042
Trucks4%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 290 Wbml over William Cannon Dr; Willi built?

It was built in 2025, making it 0 years old in 2025.

What condition is US 290 Wbml over William Cannon Dr; Willi in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does US 290 Wbml over William Cannon Dr; Willi carry?

About 83,327 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is US 290 Wbml over William Cannon Dr; Willi?

The structure is 3,956 ft (1,205.7 m) long with a longest span of 133 ft (40.4 m) and a deck 58 ft wide.

Who owns US 290 Wbml over William Cannon Dr; Willi?

It is owned by the State Highway Agency.