US Bridges

Stassney Lane over IH 35 Ml

Good

Travis County, Texas · 1.4 MI S of SH 71 · Structure no. 142270001513675

Built
2019
6 years old
Condition
Good
inspected August 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
197 ft
2 main spans
Daily traffic
160,310
2013 count
Owner
State
State Highway Agency

About this bridge

Stassney Lane over IH 35 Ml is a prestressed concrete box beam or girders - multiple carrying Stassney Lane over IH 35 Ml in Travis County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 160,310 vehicles a day, roughly 10% of them trucks, projected to reach 245,380 by 2025. The structure is 197 ft (60 m) long and 105 ft wide.

CarriesStassney Lane
CrossesIH 35 Ml
Location1.4 MI S of SH 71
RouteCity Street 0
StateTexas
Coordinates30.19847, -97.76406
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length197 ft (60 m)
Longest span103 ft (31.4 m)
Deck width105 ft (32 m)
Roadway width86 ft (26.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic160,310 (2013)
Projected traffic245,380 by 2025
Trucks10%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Stassney Lane over IH 35 Ml built?

It was built in 2019, making it 6 years old in 2025.

What condition is Stassney Lane over IH 35 Ml in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Stassney Lane over IH 35 Ml carry?

About 160,310 vehicles per day (2013 count), of which roughly 10% are trucks.

How long is Stassney Lane over IH 35 Ml?

The structure is 197 ft (60 m) long with a longest span of 103 ft (31.4 m) and a deck 105 ft wide.

Who owns Stassney Lane over IH 35 Ml?

It is owned by the State Highway Agency.