IH 35 SB FR over US 290 / Spur 69
FairTravis County, Texas · US290/IH35 Interchange · Structure no. 142270001513388
- Built
- 1980
- 45 years old, rebuilt 2002
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 248 ft
- 2 main spans
- Daily traffic
- 19,940
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35 SB FR over US 290 / Spur 69 is a prestressed concrete stringer/multi-beam or girder carrying IH 35 SB FR over US 290 / Spur 69 in Travis County, Texas. It was built in 1980 and reconstructed in 2002, so it is 45 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,940 vehicles a day, roughly 9% of them trucks, projected to reach 27,920 by 2033. The structure is 248 ft (75.6 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35 SB FR over US 290 / Spur 69 built?
It was built in 1980, making it 45 years old in 2025. It was reconstructed in 2002.
What condition is IH 35 SB FR over US 290 / Spur 69 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does IH 35 SB FR over US 290 / Spur 69 carry?
About 19,940 vehicles per day (2013 count), of which roughly 9% are trucks.
How long is IH 35 SB FR over US 290 / Spur 69?
The structure is 248 ft (75.6 m) long with a longest span of 132 ft (40.2 m) and a deck 50 ft wide.
Who owns IH 35 SB FR over US 290 / Spur 69?
It is owned by the State Highway Agency.