IH 35 SB Ml over Walnut Creek
GoodTravis County, Texas · 1.4 MI S of FM 734 · Structure no. 142270001513095
- Built
- 1954
- 71 years old, rebuilt 1988
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 182 ft
- 3 main spans
- Daily traffic
- 78,110
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35 SB Ml over Walnut Creek is a steel continuous stringer/multi-beam or girder carrying IH 35 SB Ml over Walnut Creek in Travis County, Texas. It was built in 1954 and reconstructed in 1988, so it is 71 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 78,110 vehicles a day, roughly 10% of them trucks, projected to reach 99,610 by 2033. The structure is 182 ft (55.5 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35 SB Ml over Walnut Creek built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1988.
What condition is IH 35 SB Ml over Walnut Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does IH 35 SB Ml over Walnut Creek carry?
About 78,110 vehicles per day (2018 count), of which roughly 10% are trucks.
How long is IH 35 SB Ml over Walnut Creek?
The structure is 182 ft (55.5 m) long with a longest span of 70 ft (21.3 m) and a deck 61 ft wide.
Who owns IH 35 SB Ml over Walnut Creek?
It is owned by the State Highway Agency.