FM 2335 over South Concho River Rel
GoodTom Green County, Texas · 0.45 MI W of US 277 · Structure no. 072260222801010
- Built
- 1962
- 63 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 273 ft
- 9 main spans
- Daily traffic
- 614
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
FM 2335 over South Concho River Rel is a concrete stringer/multi-beam or girder carrying FM 2335 over South Concho River Rel in Tom Green County, Texas. It was built in 1962, so it is 63 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 614 vehicles a day, roughly 16% of them trucks, projected to reach 1,167 by 2042. The structure is 273 ft (83.2 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 2335 over South Concho River Rel built?
It was built in 1962, making it 63 years old in 2025.
What condition is FM 2335 over South Concho River Rel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does FM 2335 over South Concho River Rel carry?
About 614 vehicles per day (2022 count), of which roughly 16% are trucks.
How long is FM 2335 over South Concho River Rel?
The structure is 273 ft (83.2 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.
Who owns FM 2335 over South Concho River Rel?
It is owned by the State Highway Agency.