US Bridges

RM 2034 over North Concho River Rel

Fair

Tom Green County, Texas · 0.95 MI SW of US 87 · Structure no. 072260201004010

Built
1980
45 years old
Condition
Fair
inspected June 2024
Type
Culvert
Concrete
Length
159 ft
15 main spans
Daily traffic
188
2022 count
Owner
State
State Highway Agency

About this bridge

RM 2034 over North Concho River Rel is a concrete culvert carrying RM 2034 over North Concho River Rel in Tom Green County, Texas. It was built in 1980, so it is 45 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 188 vehicles a day, roughly 13% of them trucks, projected to reach 252 by 2042. The structure is 159 ft (48.5 m) long and 28 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesRM 2034
CrossesNorth Concho River Rel
Location0.95 MI SW of US 87
RouteState Highway 2034
StateTexas
Coordinates31.66481, -100.73833
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans15
Design loadUnknown
Structure length159 ft (48.5 m)
Longest span10 ft (3 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic188 (2022)
Projected traffic252 by 2042
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was RM 2034 over North Concho River Rel built?

It was built in 1980, making it 45 years old in 2025.

What condition is RM 2034 over North Concho River Rel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does RM 2034 over North Concho River Rel carry?

About 188 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is RM 2034 over North Concho River Rel?

The structure is 159 ft (48.5 m) long with a longest span of 10 ft (3 m) and a deck 28 ft wide.

Who owns RM 2034 over North Concho River Rel?

It is owned by the State Highway Agency.