US Bridges

Lp 110 over S Concho River Relief

Fair

Tom Green County, Texas · 0.10 MI S of FM 2084 · Structure no. 072260015908006

Built
1933
92 years old
Condition
Fair
inspected June 2024
Type
Culvert
Concrete
Length
155 ft
10 main spans
Daily traffic
711
2023 count
Owner
State
State Highway Agency

About this bridge

Lp 110 over S Concho River Relief is a concrete culvert carrying Lp 110 over S Concho River Relief in Tom Green County, Texas. It was built in 1933, so it is 92 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 711 vehicles a day, roughly 12% of them trucks, projected to reach 1,276 by 2042. The structure is 155 ft (47.2 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLp 110
CrossesS Concho River Relief
Location0.10 MI S of FM 2084
RouteState Highway 110
StateTexas
Coordinates31.18491, -100.50074
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans10
Design loadUnknown
Structure length155 ft (47.2 m)
Longest span10 ft (3 m)
Deck width29 ft (8.8 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic711 (2023)
Projected traffic1,276 by 2042
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lp 110 over S Concho River Relief built?

It was built in 1933, making it 92 years old in 2025.

What condition is Lp 110 over S Concho River Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Lp 110 over S Concho River Relief carry?

About 711 vehicles per day (2023 count), of which roughly 12% are trucks.

How long is Lp 110 over S Concho River Relief?

The structure is 155 ft (47.2 m) long with a longest span of 10 ft (3 m) and a deck 29 ft wide.

Who owns Lp 110 over S Concho River Relief?

It is owned by the State Highway Agency.