US Bridges

CR 4550 over Hart Creek

Good

Titus County, Texas · 2.5 MI E of US271(VIA4530 · Structure no. 192250AA4550001

Built
2022
3 years old
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
81
2019 count
Owner
County
County Highway Agency

About this bridge

CR 4550 over Hart Creek is a prestressed concrete box beam or girders - multiple carrying CR 4550 over Hart Creek in Titus County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 81 vehicles a day, projected to reach 97 by 2033. The structure is 65 ft (19.8 m) long and 26 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesCR 4550
CrossesHart Creek
Location2.5 MI E of US271(VIA4530
RouteCounty Highway 4550
StateTexas
Coordinates33.09413, -94.94444
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length65 ft (19.8 m)
Longest span65 ft (19.8 m)
Deck width26 ft (8 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic81 (2019)
Projected traffic97 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 4550 over Hart Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is CR 4550 over Hart Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does CR 4550 over Hart Creek carry?

About 81 vehicles per day (2019 count).

How long is CR 4550 over Hart Creek?

The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 26 ft wide.

Who owns CR 4550 over Hart Creek?

It is owned by the County Highway Agency.