US Bridges

CR 4205 over Hart Creek Relief

Good

Titus County, Texas · 2.4 MI E of Bus 271 · Structure no. 192250AA0259001

Built
1986
39 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
43 ft
5 main spans
Daily traffic
562
2013 count
Owner
County
County Highway Agency

About this bridge

CR 4205 over Hart Creek Relief is a concrete culvert carrying CR 4205 over Hart Creek Relief in Titus County, Texas. It was built in 1986, so it is 39 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 562 vehicles a day, projected to reach 562 by 2033. The structure is 43 ft (13.1 m) long and 54 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesCR 4205
CrossesHart Creek Relief
Location2.4 MI E of Bus 271
RouteCounty Highway 4205
StateTexas
Coordinates33.15422, -94.93283
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length43 ft (13.1 m)
Longest span8 ft (2.4 m)
Deck width54 ft (16.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic562 (2013)
Projected traffic562 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 4205 over Hart Creek Relief built?

It was built in 1986, making it 39 years old in 2025.

What condition is CR 4205 over Hart Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does CR 4205 over Hart Creek Relief carry?

About 562 vehicles per day (2013 count).

How long is CR 4205 over Hart Creek Relief?

The structure is 43 ft (13.1 m) long with a longest span of 8 ft (2.4 m) and a deck 54 ft wide.

Who owns CR 4205 over Hart Creek Relief?

It is owned by the County Highway Agency.