US Bridges

FM 1993 over Horse Creek Relief

Good

Titus County, Texas · 2.50 MI N of US 67 · Structure no. 192250122603003

Built
1954
71 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
22 ft
3 main spans
Daily traffic
608
2020 count
Owner
State
State Highway Agency

About this bridge

FM 1993 over Horse Creek Relief is a concrete culvert carrying FM 1993 over Horse Creek Relief in Titus County, Texas. It was built in 1954, so it is 71 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 608 vehicles a day, roughly 14% of them trucks, projected to reach 1,070 by 2033. The structure is 22 ft (6.7 m) long and 31 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesFM 1993
CrossesHorse Creek Relief
Location2.50 MI N of US 67
RouteState Highway 1993
StateTexas
Coordinates33.22207, -94.86634
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span7 ft (2.1 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic608 (2020)
Projected traffic1,070 by 2033
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 1993 over Horse Creek Relief built?

It was built in 1954, making it 71 years old in 2025.

What condition is FM 1993 over Horse Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does FM 1993 over Horse Creek Relief carry?

About 608 vehicles per day (2020 count), of which roughly 14% are trucks.

How long is FM 1993 over Horse Creek Relief?

The structure is 22 ft (6.7 m) long with a longest span of 7 ft (2.1 m) and a deck 31 ft wide.

Who owns FM 1993 over Horse Creek Relief?

It is owned by the State Highway Agency.