US 271 over Draw
GoodTitus County, Texas · 0.65 MI S of US 67 · Structure no. 192250024809059
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected August 2024
- Type
- Culvert
- Concrete
- Length
- 39 ft
- 3 main spans
- Daily traffic
- 5,176
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 271 over Draw is a concrete culvert carrying US 271 over Draw in Titus County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,176 vehicles a day, roughly 15% of them trucks, projected to reach 10,313 by 2034. The structure is 39 ft (11.9 m) long.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 271 over Draw built?
It was built in 2014, making it 11 years old in 2025.
What condition is US 271 over Draw in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does US 271 over Draw carry?
About 5,176 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is US 271 over Draw?
The structure is 39 ft (11.9 m) long with a longest span of 9 ft (2.7 m).
Who owns US 271 over Draw?
It is owned by the State Highway Agency.