US 271 over Sulphur River Relief
GoodTitus County, Texas · 1.40 MI N of FM 71 · Structure no. 192250022105060
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 430 ft
- 4 main spans
- Daily traffic
- 4,638
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 271 over Sulphur River Relief is a prestressed concrete stringer/multi-beam or girder carrying US 271 over Sulphur River Relief in Titus County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,638 vehicles a day, roughly 20% of them trucks, projected to reach 6,440 by 2033. The structure is 430 ft (131.1 m) long and 86 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 271 over Sulphur River Relief built?
It was built in 2008, making it 17 years old in 2025.
What condition is US 271 over Sulphur River Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does US 271 over Sulphur River Relief carry?
About 4,638 vehicles per day (2020 count), of which roughly 20% are trucks.
How long is US 271 over Sulphur River Relief?
The structure is 430 ft (131.1 m) long with a longest span of 80 ft (24.4 m) and a deck 86 ft wide.
Who owns US 271 over Sulphur River Relief?
It is owned by the State Highway Agency.