US Bridges

Bell PLAINS(CR255) over Dry Creek

Good

Taylor County, Texas · 0.25 MI E of FM 89 · Structure no. 082210AA0255001

Built
2009
16 years old
Condition
Good
inspected January 2024
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
794
2020 count
Owner
County
County Highway Agency

About this bridge

Bell PLAINS(CR255) over Dry Creek is a concrete culvert carrying Bell PLAINS(CR255) over Dry Creek in Taylor County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 794 vehicles a day, roughly 3% of them trucks, projected to reach 1,112 by 2040. The structure is 22 ft (6.7 m) long and 22 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesBell PLAINS(CR255)
CrossesDry Creek
Location0.25 MI E of FM 89
RouteCounty Highway 255
StateTexas
Coordinates32.30142, -99.81393
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width22 ft (6.7 m)
Roadway width22 ft (6.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic794 (2020)
Projected traffic1,112 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bell PLAINS(CR255) over Dry Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is Bell PLAINS(CR255) over Dry Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Bell PLAINS(CR255) over Dry Creek carry?

About 794 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Bell PLAINS(CR255) over Dry Creek?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 22 ft wide.

Who owns Bell PLAINS(CR255) over Dry Creek?

It is owned by the County Highway Agency.