Loop 322 E Frtg RD over Drainage Ditch
FairTaylor County, Texas · 5.30 MI S of IH 20 · Structure no. 082210239801013
- Built
- 1981
- 44 years old, rebuilt 2014
- Condition
- Fair
- inspected July 2023
- Type
- Culvert
- Concrete
- Length
- 27 ft
- 5 main spans
- Daily traffic
- 5,800
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
Loop 322 E Frtg RD over Drainage Ditch is a concrete culvert carrying Loop 322 E Frtg RD over Drainage Ditch in Taylor County, Texas. It was built in 1981 and reconstructed in 2014, so it is 44 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,800 vehicles a day, roughly 8% of them trucks, projected to reach 9,670 by 2031. The structure is 27 ft (8.2 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Loop 322 E Frtg RD over Drainage Ditch built?
It was built in 1981, making it 44 years old in 2025. It was reconstructed in 2014.
What condition is Loop 322 E Frtg RD over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Loop 322 E Frtg RD over Drainage Ditch carry?
About 5,800 vehicles per day (2011 count), of which roughly 8% are trucks.
How long is Loop 322 E Frtg RD over Drainage Ditch?
The structure is 27 ft (8.2 m) long with a longest span of 5 ft (1.5 m) and a deck 45 ft wide.
Who owns Loop 322 E Frtg RD over Drainage Ditch?
It is owned by the State Highway Agency.