US Bridges

NW 19th ST over Trib W Fork Trinity Riv

Good

Tarrant County, Texas · 50 Ft NW Lydon ST · Structure no. 022200ZZ2950001

Built
1990
35 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
35 ft
4 main spans
Daily traffic
292
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

NW 19th ST over Trib W Fork Trinity Riv is a concrete culvert carrying NW 19th ST over Trib W Fork Trinity Riv in Tarrant County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 292 vehicles a day, projected to reach 360 by 2035. The structure is 35 ft (10.7 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNW 19th ST
CrossesTrib W Fork Trinity Riv
Location50 Ft NW Lydon ST
RouteCity Street 0
StateTexas
Coordinates32.79474, -97.38779
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length35 ft (10.7 m)
Longest span8 ft (2.4 m)
Deck width52 ft (15.9 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic292 (2024)
Projected traffic360 by 2035
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$25,000
NavigationNo navigation control on waterway

Frequently asked questions

When was NW 19th ST over Trib W Fork Trinity Riv built?

It was built in 1990, making it 35 years old in 2025.

What condition is NW 19th ST over Trib W Fork Trinity Riv in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does NW 19th ST over Trib W Fork Trinity Riv carry?

About 292 vehicles per day (2024 count).

How long is NW 19th ST over Trib W Fork Trinity Riv?

The structure is 35 ft (10.7 m) long with a longest span of 8 ft (2.4 m) and a deck 52 ft wide.

Who owns NW 19th ST over Trib W Fork Trinity Riv?

It is owned by the City or Municipal Highway Agency.