US Bridges

E. 1st Street over W. Relief W. Fk. Trinity

Good

Tarrant County, Texas · 0.6 Mi. E. of Beach St. · Structure no. 022200ZZ0075003

Built
2016
9 years old
Condition
Good
inspected March 2024
Type
Slab
Prestressed Concrete
Length
240 ft
6 main spans
Daily traffic
5,200
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

E. 1st Street over W. Relief W. Fk. Trinity is a prestressed concrete slab carrying E. 1st Street over W. Relief W. Fk. Trinity in Tarrant County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,200 vehicles a day, projected to reach 7,200 by 2035. The structure is 240 ft (73.2 m) long and 73 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE. 1st Street
CrossesW. Relief W. Fk. Trinity
Location0.6 Mi. E. of Beach St.
RouteCity Street 0
StateTexas
Coordinates32.76562, -97.27667
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length240 ft (73.2 m)
Longest span40 ft (12.2 m)
Deck width73 ft (22.2 m)
Roadway width56 ft (17 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,200 (2016)
Projected traffic7,200 by 2035
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was E. 1st Street over W. Relief W. Fk. Trinity built?

It was built in 2016, making it 9 years old in 2025.

What condition is E. 1st Street over W. Relief W. Fk. Trinity in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does E. 1st Street over W. Relief W. Fk. Trinity carry?

About 5,200 vehicles per day (2016 count).

How long is E. 1st Street over W. Relief W. Fk. Trinity?

The structure is 240 ft (73.2 m) long with a longest span of 40 ft (12.2 m) and a deck 73 ft wide.

Who owns E. 1st Street over W. Relief W. Fk. Trinity?

It is owned by the City or Municipal Highway Agency.