N University DR NB over W Frk Trin/Rockwd Pk DR
FairTarrant County, Texas · 0.5 MI SW SH 199 N. IH 30 · Structure no. 022200ZU3000002
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 243 ft
- 3 main spans
- Daily traffic
- 9,931
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
N University DR NB over W Frk Trin/Rockwd Pk DR is a steel continuous stringer/multi-beam or girder carrying N University DR NB over W Frk Trin/Rockwd Pk DR in Tarrant County, Texas. It was built in 1959, so it is 66 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,931 vehicles a day, roughly 20% of them trucks, projected to reach 28,240 by 2035. The structure is 243 ft (74.1 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N University DR NB over W Frk Trin/Rockwd Pk DR built?
It was built in 1959, making it 66 years old in 2025.
What condition is N University DR NB over W Frk Trin/Rockwd Pk DR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does N University DR NB over W Frk Trin/Rockwd Pk DR carry?
About 9,931 vehicles per day (2022 count), of which roughly 20% are trucks.
How long is N University DR NB over W Frk Trin/Rockwd Pk DR?
The structure is 243 ft (74.1 m) long with a longest span of 75 ft (22.9 m) and a deck 44 ft wide.
Who owns N University DR NB over W Frk Trin/Rockwd Pk DR?
It is owned by the City or Municipal Highway Agency.