US Bridges

Timberland Blvd over Drainage Ditch

Good

Tarrant County, Texas · 0.36 MI W of Alta Vista R · Structure no. 022200ZT5040002

Built
2006
19 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
30 ft
3 main spans
Daily traffic
10,936
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Timberland Blvd over Drainage Ditch is a concrete culvert carrying Timberland Blvd over Drainage Ditch in Tarrant County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,936 vehicles a day, roughly 1% of them trucks, projected to reach 3,000 by 2036. The structure is 30 ft (9.1 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTimberland Blvd
CrossesDrainage Ditch
Location0.36 MI W of Alta Vista R
RouteCity Street 0
StateTexas
Coordinates32.95148, -97.28712
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span8 ft (2.4 m)
Deck width59 ft (17.9 m)
Roadway width54 ft (16.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,936 (2019)
Projected traffic3,000 by 2036
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Timberland Blvd over Drainage Ditch built?

It was built in 2006, making it 19 years old in 2025.

What condition is Timberland Blvd over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Timberland Blvd over Drainage Ditch carry?

About 10,936 vehicles per day (2019 count), of which roughly 1% are trucks.

How long is Timberland Blvd over Drainage Ditch?

The structure is 30 ft (9.1 m) long with a longest span of 8 ft (2.4 m) and a deck 59 ft wide.

Who owns Timberland Blvd over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.