Mark IV Pkwy NB over Little Fossil Creek
GoodTarrant County, Texas · 0.4 MI S of IH 820 · Structure no. 022200ZM2190001
- Built
- 1970
- 55 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 91 ft
- 3 main spans
- Daily traffic
- 5,831
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Mark IV Pkwy NB over Little Fossil Creek is a concrete stringer/multi-beam or girder carrying Mark IV Pkwy NB over Little Fossil Creek in Tarrant County, Texas. It was built in 1970, so it is 55 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,831 vehicles a day, roughly 20% of them trucks, projected to reach 12,410 by 2036. The structure is 91 ft (27.7 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mark IV Pkwy NB over Little Fossil Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is Mark IV Pkwy NB over Little Fossil Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Mark IV Pkwy NB over Little Fossil Creek carry?
About 5,831 vehicles per day (2024 count), of which roughly 20% are trucks.
How long is Mark IV Pkwy NB over Little Fossil Creek?
The structure is 91 ft (27.7 m) long with a longest span of 30 ft (9.1 m) and a deck 39 ft wide.
Who owns Mark IV Pkwy NB over Little Fossil Creek?
It is owned by the City or Municipal Highway Agency.