Bryant Irvin RD over Drainage Relief System
GoodTarrant County, Texas · 0.1 MI S of Vickery Blvd. · Structure no. 022200ZB8300002
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 17,996
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Bryant Irvin RD over Drainage Relief System is a prestressed concrete stringer/multi-beam or girder carrying Bryant Irvin RD over Drainage Relief System in Tarrant County, Texas. It was built in 1993, so it is 32 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,996 vehicles a day, projected to reach 30,350 by 2034. The structure is 103 ft (31.4 m) long and 68 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bryant Irvin RD over Drainage Relief System built?
It was built in 1993, making it 32 years old in 2025.
What condition is Bryant Irvin RD over Drainage Relief System in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Bryant Irvin RD over Drainage Relief System carry?
About 17,996 vehicles per day (2024 count).
How long is Bryant Irvin RD over Drainage Relief System?
The structure is 103 ft (31.4 m) long with a longest span of 100 ft (30.5 m) and a deck 68 ft wide.
Who owns Bryant Irvin RD over Drainage Relief System?
It is owned by the City or Municipal Highway Agency.