US Bridges

Canoe Way over S Fork Deer Creek

Good

Tarrant County, Texas · 0.1 MI S of Mcdonald DR · Structure no. 022200TT0000002

Built
2019
6 years old
Condition
Good
inspected January 2024
Type
Culvert
Concrete
Length
88 ft
8 main spans
Daily traffic
330
2009 count
Owner
City
City or Municipal Highway Agency

About this bridge

Canoe Way over S Fork Deer Creek is a concrete culvert carrying Canoe Way over S Fork Deer Creek in Tarrant County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 330 vehicles a day, roughly 3% of them trucks, projected to reach 330 by 2042. The structure is 88 ft (26.8 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCanoe Way
CrossesS Fork Deer Creek
Location0.1 MI S of Mcdonald DR
RouteCity Street 0
StateTexas
Coordinates32.55992, -97.37179
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans8
Design loadUnknown
Structure length88 ft (26.8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic330 (2009)
Projected traffic330 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Canoe Way over S Fork Deer Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Canoe Way over S Fork Deer Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Canoe Way over S Fork Deer Creek carry?

About 330 vehicles per day (2009 count), of which roughly 3% are trucks.

How long is Canoe Way over S Fork Deer Creek?

The structure is 88 ft (26.8 m) long with a longest span of 10 ft (3 m).

Who owns Canoe Way over S Fork Deer Creek?

It is owned by the City or Municipal Highway Agency.