Denver Trail over Ash Creek
GoodTarrant County, Texas · 0.20 MI NE of HWY 199 · Structure no. 022200T01615001
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,040 ft
- 13 main spans
- Daily traffic
- 3,402
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Denver Trail over Ash Creek is a prestressed concrete stringer/multi-beam or girder carrying Denver Trail over Ash Creek in Tarrant County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,402 vehicles a day, roughly 1% of them trucks, projected to reach 2,000 by 2036. The structure is 1,040 ft (317 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Denver Trail over Ash Creek built?
It was built in 2010, making it 15 years old in 2025.
What condition is Denver Trail over Ash Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Denver Trail over Ash Creek carry?
About 3,402 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Denver Trail over Ash Creek?
The structure is 1,040 ft (317 m) long with a longest span of 80 ft (24.4 m) and a deck 46 ft wide.
Who owns Denver Trail over Ash Creek?
It is owned by the City or Municipal Highway Agency.