South Stewart St. over Ash Creek
GoodTarrant County, Texas · 0.14 Mi. S. of SP 344 · Structure no. 022200T00155002
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 120 ft
- 1 main span
- Daily traffic
- 5,960
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
South Stewart St. over Ash Creek is a prestressed concrete stringer/multi-beam or girder carrying South Stewart St. over Ash Creek in Tarrant County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,960 vehicles a day, roughly 10% of them trucks, projected to reach 9,500 by 2035. The structure is 120 ft (36.6 m) long and 42 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Stewart St. over Ash Creek built?
It was built in 2015, making it 10 years old in 2025.
What condition is South Stewart St. over Ash Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does South Stewart St. over Ash Creek carry?
About 5,960 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is South Stewart St. over Ash Creek?
The structure is 120 ft (36.6 m) long with a longest span of 58 ft (17.7 m) and a deck 42 ft wide.
Who owns South Stewart St. over Ash Creek?
It is owned by the City or Municipal Highway Agency.