US Bridges

Great SW Pkwy NB over Fish Creek

Good

Tarrant County, Texas · 1.10 MI S of IH 20 Ebfr · Structure no. 022200S45075005

Built
1987
38 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
185 ft
2 main spans
Daily traffic
4,865
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Great SW Pkwy NB over Fish Creek is a prestressed concrete stringer/multi-beam or girder carrying Great SW Pkwy NB over Fish Creek in Tarrant County, Texas. It was built in 1987, so it is 38 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,865 vehicles a day, projected to reach 14,480 by 2033. The structure is 185 ft (56.4 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGreat SW Pkwy NB
CrossesFish Creek
Location1.10 MI S of IH 20 Ebfr
RouteCity Street 0
StateTexas
Coordinates32.65923, -97.04207
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+1 approach)
Design loadUnknown
Structure length185 ft (56.4 m)
Longest span70 ft (21.3 m)
Deck width36 ft (11 m)
Roadway width33 ft (10.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,865 (2024)
Projected traffic14,480 by 2033
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Great SW Pkwy NB over Fish Creek built?

It was built in 1987, making it 38 years old in 2025.

What condition is Great SW Pkwy NB over Fish Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Great SW Pkwy NB over Fish Creek carry?

About 4,865 vehicles per day (2024 count).

How long is Great SW Pkwy NB over Fish Creek?

The structure is 185 ft (56.4 m) long with a longest span of 70 ft (21.3 m) and a deck 36 ft wide.

Who owns Great SW Pkwy NB over Fish Creek?

It is owned by the City or Municipal Highway Agency.