US Bridges

England Pkwy EB over Drain

Good

Tarrant County, Texas · 2.25 MI NE of SH 360 · Structure no. 022200S40498001

Built
2004
21 years old
Condition
Good
inspected July 2024
Type
Culvert
Concrete
Length
30 ft
3 main spans
Daily traffic
458
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

England Pkwy EB over Drain is a concrete culvert carrying England Pkwy EB over Drain in Tarrant County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 458 vehicles a day, projected to reach 970 by 2033. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesEngland Pkwy EB
CrossesDrain
Location2.25 MI NE of SH 360
RouteCity Street 0
StateTexas
Coordinates32.59227, -97.04495
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span11 ft (3.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic458 (2019)
Projected traffic970 by 2033
Trucks0%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was England Pkwy EB over Drain built?

It was built in 2004, making it 21 years old in 2025.

What condition is England Pkwy EB over Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does England Pkwy EB over Drain carry?

About 458 vehicles per day (2019 count).

How long is England Pkwy EB over Drain?

The structure is 30 ft (9.1 m) long with a longest span of 11 ft (3.4 m).

Who owns England Pkwy EB over Drain?

It is owned by the City or Municipal Highway Agency.