US Bridges

Girona DR over Entrada Lake

Good

Tarrant County, Texas · 0.2 MI E of Davis Blvd · Structure no. 022200NN0072001

Built
2018
7 years old
Condition
Good
inspected July 2024
Type
Arch - Deck
Concrete
Length
64 ft
1 main span
Daily traffic
200
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Girona DR over Entrada Lake is a concrete arch - deck carrying Girona DR over Entrada Lake in Tarrant County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, projected to reach 1,000 by 2040. The structure is 64 ft (19.5 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGirona DR
CrossesEntrada Lake
Location0.2 MI E of Davis Blvd
RouteCity Street 0
StateTexas
Coordinates32.9859, -97.17895
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length64 ft (19.5 m)
Longest span24 ft (7.3 m)
Deck width49 ft (15 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2021)
Projected traffic1,000 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Girona DR over Entrada Lake built?

It was built in 2018, making it 7 years old in 2025.

What condition is Girona DR over Entrada Lake in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Girona DR over Entrada Lake carry?

About 200 vehicles per day (2021 count).

How long is Girona DR over Entrada Lake?

The structure is 64 ft (19.5 m) long with a longest span of 24 ft (7.3 m) and a deck 49 ft wide.

Who owns Girona DR over Entrada Lake?

It is owned by the Town or Township Highway Agency.