US Bridges

Harwood Road over Sulphur Branch

Good

Tarrant County, Texas · 0.9 MI N SH121 E FM3029 · Structure no. 022200J00615001

Built
2004
21 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
31 ft
3 main spans
Daily traffic
13,847
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Harwood Road over Sulphur Branch is a concrete culvert carrying Harwood Road over Sulphur Branch in Tarrant County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,847 vehicles a day, projected to reach 29,700 by 2034. The structure is 31 ft (9.4 m) long and 98 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHarwood Road
CrossesSulphur Branch
Location0.9 MI N SH121 E FM3029
RouteCity Street 0
StateTexas
Coordinates32.85371, -97.15624
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length31 ft (9.4 m)
Longest span10 ft (3 m)
Deck width98 ft (29.9 m)
Roadway width59 ft (18 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,847 (2024)
Projected traffic29,700 by 2034
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Harwood Road over Sulphur Branch built?

It was built in 2004, making it 21 years old in 2025.

What condition is Harwood Road over Sulphur Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Harwood Road over Sulphur Branch carry?

About 13,847 vehicles per day (2024 count).

How long is Harwood Road over Sulphur Branch?

The structure is 31 ft (9.4 m) long with a longest span of 10 ft (3 m) and a deck 98 ft wide.

Who owns Harwood Road over Sulphur Branch?

It is owned by the City or Municipal Highway Agency.