US Bridges

Kennedale New Hope over Trib of Village Creek

GoodPosted for load

Tarrant County, Texas · 1.4 MI S Spr 496 Kennedal · Structure no. 022200HH0243003

Built
2023
2 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
50 ft
4 main spans
Daily traffic
3,024
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Kennedale New Hope over Trib of Village Creek is a concrete culvert carrying Kennedale New Hope over Trib of Village Creek in Tarrant County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 3,024 vehicles a day, roughly 3% of them trucks, projected to reach 4,234 by 2042. The structure is 50 ft (15.2 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesKennedale New Hope
CrossesTrib of Village Creek
Location1.4 MI S Spr 496 Kennedal
RouteCity Street 0
StateTexas
Coordinates32.62552, -97.2191
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length50 ft (15.2 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,024 (2019)
Projected traffic4,234 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Kennedale New Hope over Trib of Village Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Kennedale New Hope over Trib of Village Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Kennedale New Hope over Trib of Village Creek carry?

About 3,024 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Kennedale New Hope over Trib of Village Creek?

The structure is 50 ft (15.2 m) long with a longest span of 12 ft (3.7 m).

Who owns Kennedale New Hope over Trib of Village Creek?

It is owned by the City or Municipal Highway Agency.