US Bridges

Glenview Drive over Trib of Big Fossil CR

Good

Tarrant County, Texas · 0.15 MI E of Rufe Snow · Structure no. 022200G00155001

Built
1969
56 years old
Condition
Good
inspected July 2024
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
13,644
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Glenview Drive over Trib of Big Fossil CR is a concrete culvert carrying Glenview Drive over Trib of Big Fossil CR in Tarrant County, Texas. It was built in 1969, so it is 56 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,644 vehicles a day, projected to reach 10,800 by 2033. The structure is 22 ft (6.7 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGlenview Drive
CrossesTrib of Big Fossil CR
Location0.15 MI E of Rufe Snow
RouteCity Street 0
StateTexas
Coordinates32.8239, -97.23564
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width56 ft (17.1 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,644 (2024)
Projected traffic10,800 by 2033
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$3,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Glenview Drive over Trib of Big Fossil CR built?

It was built in 1969, making it 56 years old in 2025.

What condition is Glenview Drive over Trib of Big Fossil CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Glenview Drive over Trib of Big Fossil CR carry?

About 13,644 vehicles per day (2024 count).

How long is Glenview Drive over Trib of Big Fossil CR?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 56 ft wide.

Who owns Glenview Drive over Trib of Big Fossil CR?

It is owned by the City or Municipal Highway Agency.