US Bridges

Haslet Parkway over Trib to Buffalo Creek

Good

Tarrant County, Texas · 0.5 MI W of IH 35 Left FR · Structure no. 022200FF0031010

Built
2021
4 years old, rebuilt 2023
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
80 ft
5 main spans
Daily traffic
20,255
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Haslet Parkway over Trib to Buffalo Creek is a concrete culvert carrying Haslet Parkway over Trib to Buffalo Creek in Tarrant County, Texas. It was built in 2021 and reconstructed in 2023, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,255 vehicles a day, roughly 5% of them trucks, projected to reach 15,200 by 2045. The structure is 80 ft (24.4 m) long and 115 ft wide.

CarriesHaslet Parkway
CrossesTrib to Buffalo Creek
Location0.5 MI W of IH 35 Left FR
RouteCity Street 0
StateTexas
Coordinates32.95984, -97.31987
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadHL 93
Structure length80 ft (24.4 m)
Longest span12 ft (3.7 m)
Deck width115 ft (35.1 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,255 (2021)
Projected traffic15,200 by 2045
Trucks5%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Haslet Parkway over Trib to Buffalo Creek built?

It was built in 2021, making it 4 years old in 2025. It was reconstructed in 2023.

What condition is Haslet Parkway over Trib to Buffalo Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Haslet Parkway over Trib to Buffalo Creek carry?

About 20,255 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Haslet Parkway over Trib to Buffalo Creek?

The structure is 80 ft (24.4 m) long with a longest span of 12 ft (3.7 m) and a deck 115 ft wide.

Who owns Haslet Parkway over Trib to Buffalo Creek?

It is owned by the City or Municipal Highway Agency.