US Bridges

West Pipeline RD over Trib to Hurricane Creek

Good

Tarrant County, Texas · 100 Ft NW of SH-10 · Structure no. 022200F00445001

Built
2007
18 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
3,629
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

West Pipeline RD over Trib to Hurricane Creek is a concrete culvert carrying West Pipeline RD over Trib to Hurricane Creek in Tarrant County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,629 vehicles a day, projected to reach 400 by 2034. The structure is 31 ft (9.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWest Pipeline RD
CrossesTrib to Hurricane Creek
Location100 Ft NW of SH-10
RouteCity Street 0
StateTexas
Coordinates32.82218, -97.11964
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length31 ft (9.4 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,629 (2019)
Projected traffic400 by 2034
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was West Pipeline RD over Trib to Hurricane Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is West Pipeline RD over Trib to Hurricane Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does West Pipeline RD over Trib to Hurricane Creek carry?

About 3,629 vehicles per day (2019 count).

How long is West Pipeline RD over Trib to Hurricane Creek?

The structure is 31 ft (9.4 m) long with a longest span of 14 ft (4.3 m).

Who owns West Pipeline RD over Trib to Hurricane Creek?

It is owned by the City or Municipal Highway Agency.