US Bridges

Park Row Drive over Trib to Johnson Creek

Fair

Tarrant County, Texas · 0.3 MI E of Collins ST · Structure no. 022200C04560001

Built
2003
22 years old
Condition
Fair
inspected October 2023
Type
Culvert
Concrete
Length
25 ft
3 main spans
Daily traffic
18,100
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Park Row Drive over Trib to Johnson Creek is a concrete culvert carrying Park Row Drive over Trib to Johnson Creek in Tarrant County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 18,100 vehicles a day, roughly 4% of them trucks, projected to reach 23,483 by 2042. The structure is 25 ft (7.6 m) long and 62 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPark Row Drive
CrossesTrib to Johnson Creek
Location0.3 MI E of Collins ST
RouteCity Street 0
StateTexas
Coordinates32.72101, -97.0915
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length25 ft (7.6 m)
Longest span8 ft (2.4 m)
Deck width62 ft (18.9 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,100 (2024)
Projected traffic23,483 by 2042
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$3,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Park Row Drive over Trib to Johnson Creek built?

It was built in 2003, making it 22 years old in 2025.

What condition is Park Row Drive over Trib to Johnson Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Park Row Drive over Trib to Johnson Creek carry?

About 18,100 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Park Row Drive over Trib to Johnson Creek?

The structure is 25 ft (7.6 m) long with a longest span of 8 ft (2.4 m) and a deck 62 ft wide.

Who owns Park Row Drive over Trib to Johnson Creek?

It is owned by the City or Municipal Highway Agency.