US Bridges

S Collins ST NB over Fish Creek

Good

Tarrant County, Texas · .2 Miles S Green Oaks Bvd · Structure no. 022200C01201005

Built
1995
30 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
125 ft
4 main spans
Daily traffic
9,343
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

S Collins ST NB over Fish Creek is a concrete stringer/multi-beam or girder carrying S Collins ST NB over Fish Creek in Tarrant County, Texas. It was built in 1995, so it is 30 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,343 vehicles a day, roughly 3% of them trucks, projected to reach 13,080 by 2042. The structure is 125 ft (38.1 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS Collins ST NB
CrossesFish Creek
Location.2 Miles S Green Oaks Bvd
RouteCity Street 0
StateTexas
Coordinates32.64979, -97.08814
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length125 ft (38.1 m)
Longest span31 ft (9.4 m)
Deck width35 ft (10.8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,343 (2022)
Projected traffic13,080 by 2042
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$8,000
NavigationNo navigation control on waterway

Frequently asked questions

When was S Collins ST NB over Fish Creek built?

It was built in 1995, making it 30 years old in 2025.

What condition is S Collins ST NB over Fish Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does S Collins ST NB over Fish Creek carry?

About 9,343 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is S Collins ST NB over Fish Creek?

The structure is 125 ft (38.1 m) long with a longest span of 31 ft (9.4 m) and a deck 35 ft wide.

Who owns S Collins ST NB over Fish Creek?

It is owned by the City or Municipal Highway Agency.