US Bridges

S Collins ST over Tributary of Fish Creek

Good

Tarrant County, Texas · 0.1 S. of Hill Haven Ln. · Structure no. 022200C01201003

Built
1983
42 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
45 ft
4 main spans
Daily traffic
27,085
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

S Collins ST over Tributary of Fish Creek is a concrete culvert carrying S Collins ST over Tributary of Fish Creek in Tarrant County, Texas. It was built in 1983, so it is 42 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 27,085 vehicles a day, roughly 4% of them trucks, projected to reach 41,043 by 2042. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS Collins ST
CrossesTributary of Fish Creek
Location0.1 S. of Hill Haven Ln.
RouteCity Street 0
StateTexas
Coordinates32.68659, -97.09534
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length45 ft (13.7 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic27,085 (2024)
Projected traffic41,043 by 2042
Trucks4%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$5,000
NavigationNo navigation control on waterway

Frequently asked questions

When was S Collins ST over Tributary of Fish Creek built?

It was built in 1983, making it 42 years old in 2025.

What condition is S Collins ST over Tributary of Fish Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does S Collins ST over Tributary of Fish Creek carry?

About 27,085 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is S Collins ST over Tributary of Fish Creek?

The structure is 45 ft (13.7 m) long with a longest span of 9 ft (2.7 m).

Who owns S Collins ST over Tributary of Fish Creek?

It is owned by the City or Municipal Highway Agency.