US Bridges

Andalusia Trail over Tributary of Fish Creek

Good

Tarrant County, Texas · 0.1 MI E of Parliament · Structure no. 022200C00113001

Built
1977
48 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
635
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Andalusia Trail over Tributary of Fish Creek is a concrete culvert carrying Andalusia Trail over Tributary of Fish Creek in Tarrant County, Texas. It was built in 1977, so it is 48 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 635 vehicles a day, projected to reach 1,170 by 2029. The structure is 22 ft (6.7 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAndalusia Trail
CrossesTributary of Fish Creek
Location0.1 MI E of Parliament
RouteCity Street 0
StateTexas
Coordinates32.66121, -97.18199
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width60 ft (18.3 m)
Roadway width37 ft (11.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic635 (2019)
Projected traffic1,170 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Andalusia Trail over Tributary of Fish Creek built?

It was built in 1977, making it 48 years old in 2025.

What condition is Andalusia Trail over Tributary of Fish Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Andalusia Trail over Tributary of Fish Creek carry?

About 635 vehicles per day (2019 count).

How long is Andalusia Trail over Tributary of Fish Creek?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 60 ft wide.

Who owns Andalusia Trail over Tributary of Fish Creek?

It is owned by the City or Municipal Highway Agency.