US Bridges

S Turnaround #3 over Aagp RD

Good

Tarrant County, Texas · 2.70 MI N of S Airfield · Structure no. 022200BB0985060

Built
2001
24 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
57 ft
1 main span
Daily traffic
1,500
2016 count
Owner
Local
Other Local Agency

About this bridge

S Turnaround #3 over Aagp RD is a prestressed concrete box beam or girders - multiple carrying S Turnaround #3 over Aagp RD in Tarrant County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 2% of them trucks, projected to reach 2,000 by 2036. The structure is 57 ft (17.4 m) long and 19 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesS Turnaround #3
CrossesAagp RD
Location2.70 MI N of S Airfield
StateTexas
Coordinates32.90103, -97.03928
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length57 ft (17.4 m)
Longest span50 ft (15.2 m)
Deck width19 ft (5.8 m)
Roadway width16 ft (5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2016)
Projected traffic2,000 by 2036
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S Turnaround #3 over Aagp RD built?

It was built in 2001, making it 24 years old in 2025.

What condition is S Turnaround #3 over Aagp RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does S Turnaround #3 over Aagp RD carry?

About 1,500 vehicles per day (2016 count), of which roughly 2% are trucks.

How long is S Turnaround #3 over Aagp RD?

The structure is 57 ft (17.4 m) long with a longest span of 50 ft (15.2 m) and a deck 19 ft wide.

Who owns S Turnaround #3 over Aagp RD?

It is owned by the Other Local Agency.