US Bridges

SH 360 SB over Midway Drive

Good

Tarrant County, Texas · 0.5 MI N of SH 183 · Structure no. 022200226602371

Built
2006
19 years old
Condition
Good
inspected April 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
209 ft
1 main span
Daily traffic
46,685
2023 count
Owner
State
State Highway Agency

About this bridge

SH 360 SB over Midway Drive is a prestressed concrete stringer/multi-beam or girder carrying SH 360 SB over Midway Drive in Tarrant County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 46,685 vehicles a day, roughly 5% of them trucks, projected to reach 52,590 by 2033. The structure is 209 ft (63.7 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 360 SB
CrossesMidway Drive
Location0.5 MI N of SH 183
RouteState Highway 360
StateTexas
Coordinates32.84539, -97.06242
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length209 ft (63.7 m)
Longest span93 ft (28.3 m)
Deck width85 ft (26 m)
Roadway width84 ft (25.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic46,685 (2023)
Projected traffic52,590 by 2033
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 360 SB over Midway Drive built?

It was built in 2006, making it 19 years old in 2025.

What condition is SH 360 SB over Midway Drive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does SH 360 SB over Midway Drive carry?

About 46,685 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SH 360 SB over Midway Drive?

The structure is 209 ft (63.7 m) long with a longest span of 93 ft (28.3 m) and a deck 85 ft wide.

Who owns SH 360 SB over Midway Drive?

It is owned by the State Highway Agency.