US Bridges

SH 360 SB over Walnut Creek

Good

Tarrant County, Texas · 0.2 Mi. N. of Holland · Structure no. 022200226602135

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,950 ft
18 main spans
Daily traffic
13,598
2023 count
Owner
Toll Authority
Local Toll Authority

About this bridge

SH 360 SB over Walnut Creek is a prestressed concrete stringer/multi-beam or girder carrying SH 360 SB over Walnut Creek in Tarrant County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,598 vehicles a day, roughly 5% of them trucks, projected to reach 31,500 by 2037. The structure is 1,950 ft (594.4 m) long and 58 ft wide.

CarriesSH 360 SB
CrossesWalnut Creek
Location0.2 Mi. N. of Holland
StateTexas
Coordinates32.58835, -97.07821
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans18
Design loadHL 93
Structure length1,950 ft (594.4 m)
Longest span125 ft (38.1 m)
Deck width58 ft (17.7 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,598 (2023)
Projected traffic31,500 by 2037
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 360 SB over Walnut Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is SH 360 SB over Walnut Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SH 360 SB over Walnut Creek carry?

About 13,598 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SH 360 SB over Walnut Creek?

The structure is 1,950 ft (594.4 m) long with a longest span of 125 ft (38.1 m) and a deck 58 ft wide.

Who owns SH 360 SB over Walnut Creek?

It is owned by the Local Toll Authority.