US Bridges

Lynn EB WB and Ta over SH 360 Ntta

Good

Tarrant County, Texas · 0.9 Mi. S. of Camp Wisdom · Structure no. 022200226602125

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
222 ft
2 main spans
Daily traffic
30,000
2017 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Lynn EB WB and Ta over SH 360 Ntta is a prestressed concrete stringer/multi-beam or girder carrying Lynn EB WB and Ta over SH 360 Ntta in Tarrant County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,000 vehicles a day, roughly 5% of them trucks, projected to reach 31,500 by 2037. The structure is 222 ft (67.7 m) long and 118 ft wide.

CarriesLynn EB WB and Ta
CrossesSH 360 Ntta
Location0.9 Mi. S. of Camp Wisdom
RouteCity Street 0
StateTexas
Coordinates32.63568, -97.06473
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length222 ft (67.7 m)
Longest span111 ft (33.8 m)
Deck width118 ft (36 m)
Roadway width71 ft (21.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,000 (2017)
Projected traffic31,500 by 2037
Trucks5%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lynn EB WB and Ta over SH 360 Ntta built?

It was built in 2017, making it 8 years old in 2025.

What condition is Lynn EB WB and Ta over SH 360 Ntta in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Lynn EB WB and Ta over SH 360 Ntta carry?

About 30,000 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Lynn EB WB and Ta over SH 360 Ntta?

The structure is 222 ft (67.7 m) long with a longest span of 111 ft (33.8 m) and a deck 118 ft wide.

Who owns Lynn EB WB and Ta over SH 360 Ntta?

It is owned by the Local Toll Authority.