US Bridges

SH 360 Sbta/Camp W over SH 360 Ntta

Good

Tarrant County, Texas · 2.0 Mi. S. of IH20 · Structure no. 022200226602124

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
244 ft
2 main spans
Daily traffic
17,956
2024 count
Owner
Toll Authority
Local Toll Authority

About this bridge

SH 360 Sbta/Camp W over SH 360 Ntta is a prestressed concrete stringer/multi-beam or girder carrying SH 360 Sbta/Camp W over SH 360 Ntta in Tarrant County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,956 vehicles a day, roughly 5% of them trucks, projected to reach 31,500 by 2037. The structure is 244 ft (74.4 m) long and 39 ft wide.

CarriesSH 360 Sbta/Camp W
CrossesSH 360 Ntta
Location2.0 Mi. S. of IH20
RouteState Highway 360
StateTexas
Coordinates32.64826, -97.06179
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length244 ft (74.4 m)
Longest span132 ft (40.2 m)
Deck width39 ft (11.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,956 (2024)
Projected traffic31,500 by 2037
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 360 Sbta/Camp W over SH 360 Ntta built?

It was built in 2017, making it 8 years old in 2025.

What condition is SH 360 Sbta/Camp W over SH 360 Ntta in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SH 360 Sbta/Camp W over SH 360 Ntta carry?

About 17,956 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SH 360 Sbta/Camp W over SH 360 Ntta?

The structure is 244 ft (74.4 m) long with a longest span of 132 ft (40.2 m) and a deck 39 ft wide.

Who owns SH 360 Sbta/Camp W over SH 360 Ntta?

It is owned by the Local Toll Authority.