US Bridges

SH 360 SB FR over Trib. to Mountain Creek

Good

Tarrant County, Texas · 8.12 MI S of IH 20 · Structure no. 022200226602104

Built
2000
25 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete
Length
30 ft
3 main spans
Daily traffic
20,030
2009 count
Owner
State
State Highway Agency

About this bridge

SH 360 SB FR over Trib. to Mountain Creek is a concrete culvert carrying SH 360 SB FR over Trib. to Mountain Creek in Tarrant County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,030 vehicles a day, projected to reach 11,960 by 2029. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 360 SB FR
CrossesTrib. to Mountain Creek
Location8.12 MI S of IH 20
RouteState Highway 360
StateTexas
Coordinates32.56589, -97.08437
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,030 (2009)
Projected traffic11,960 by 2029
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 360 SB FR over Trib. to Mountain Creek built?

It was built in 2000, making it 25 years old in 2025.

What condition is SH 360 SB FR over Trib. to Mountain Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SH 360 SB FR over Trib. to Mountain Creek carry?

About 20,030 vehicles per day (2009 count).

How long is SH 360 SB FR over Trib. to Mountain Creek?

The structure is 30 ft (9.1 m) long with a longest span of 10 ft (3 m).

Who owns SH 360 SB FR over Trib. to Mountain Creek?

It is owned by the State Highway Agency.