US Bridges

SH 360 NB FR over Fish Creek

Good

Tarrant County, Texas · 1.0 MI S of IH 20 · Structure no. 022200226602072

Built
1994
31 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
225 ft
3 main spans
Daily traffic
23,615
2009 count
Owner
State
State Highway Agency

About this bridge

SH 360 NB FR over Fish Creek is a prestressed concrete stringer/multi-beam or girder carrying SH 360 NB FR over Fish Creek in Tarrant County, Texas. It was built in 1994, so it is 31 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23,615 vehicles a day, roughly 7% of them trucks, projected to reach 52,580 by 2029. The structure is 225 ft (68.6 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 360 NB FR
CrossesFish Creek
Location1.0 MI S of IH 20
RouteState Highway 360
StateTexas
Coordinates32.66215, -97.06174
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length225 ft (68.6 m)
Longest span75 ft (22.9 m)
Deck width44 ft (13.4 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,615 (2009)
Projected traffic52,580 by 2029
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 360 NB FR over Fish Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is SH 360 NB FR over Fish Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SH 360 NB FR over Fish Creek carry?

About 23,615 vehicles per day (2009 count), of which roughly 7% are trucks.

How long is SH 360 NB FR over Fish Creek?

The structure is 225 ft (68.6 m) long with a longest span of 75 ft (22.9 m) and a deck 44 ft wide.

Who owns SH 360 NB FR over Fish Creek?

It is owned by the State Highway Agency.