US Bridges

Avenue K over SH-360

Good

Tarrant County, Texas · 4.56 MI S of SH 183 · Structure no. 022200226602049

Built
1986
39 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
160 ft
2 main spans
Daily traffic
9,646
2019 count
Owner
State
State Highway Agency

About this bridge

Avenue K over SH-360 is a prestressed concrete stringer/multi-beam or girder carrying Avenue K over SH-360 in Tarrant County, Texas. It was built in 1986, so it is 39 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,646 vehicles a day, projected to reach 13,970 by 2029. The structure is 160 ft (48.8 m) long and 90 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesAvenue K
CrossesSH-360
Location4.56 MI S of SH 183
RouteCity Street 0
StateTexas
Coordinates32.7736, -97.06196
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length160 ft (48.8 m)
Longest span80 ft (24.4 m)
Deck width90 ft (27.4 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,646 (2019)
Projected traffic13,970 by 2029
Trucks0%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Avenue K over SH-360 built?

It was built in 1986, making it 39 years old in 2025.

What condition is Avenue K over SH-360 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Avenue K over SH-360 carry?

About 9,646 vehicles per day (2019 count).

How long is Avenue K over SH-360?

The structure is 160 ft (48.8 m) long with a longest span of 80 ft (24.4 m) and a deck 90 ft wide.

Who owns Avenue K over SH-360?

It is owned by the State Highway Agency.