US Bridges

SH360 Ml & Frtg RD over Trib. to Fish Creek

Fair

Tarrant County, Texas · 0.6 MI N of IH-20 · Structure no. 022200226602016

Built
1974
51 years old, rebuilt 1985
Condition
Fair
inspected May 2023
Type
Culvert
Concrete
Length
61 ft
4 main spans
Daily traffic
150,002
2019 count
Owner
State
State Highway Agency

About this bridge

SH360 Ml & Frtg RD over Trib. to Fish Creek is a concrete culvert carrying SH360 Ml & Frtg RD over Trib. to Fish Creek in Tarrant County, Texas. It was built in 1974 and reconstructed in 1985, so it is 51 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 150,002 vehicles a day, roughly 5% of them trucks, projected to reach 213,470 by 2033. The structure is 61 ft (18.6 m) long.

CarriesSH360 Ml & Frtg RD
CrossesTrib. to Fish Creek
Location0.6 MI N of IH-20
RouteState Highway 360
StateTexas
Coordinates32.68772, -97.06256
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length61 ft (18.6 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150,002 (2019)
Projected traffic213,470 by 2033
Trucks5%
Lanes on structure12
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH360 Ml & Frtg RD over Trib. to Fish Creek built?

It was built in 1974, making it 51 years old in 2025. It was reconstructed in 1985.

What condition is SH360 Ml & Frtg RD over Trib. to Fish Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does SH360 Ml & Frtg RD over Trib. to Fish Creek carry?

About 150,002 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is SH360 Ml & Frtg RD over Trib. to Fish Creek?

The structure is 61 ft (18.6 m) long with a longest span of 10 ft (3 m).

Who owns SH360 Ml & Frtg RD over Trib. to Fish Creek?

It is owned by the State Highway Agency.