Spur 303 over Rush Creek Relief
FairTarrant County, Texas · 6.6 MI W of SH-360 · Structure no. 022200220801003
- Built
- 1958
- 67 years old, rebuilt 2000
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 209 ft
- 5 main spans
- Daily traffic
- 17,594
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Spur 303 over Rush Creek Relief is a concrete stringer/multi-beam or girder carrying Spur 303 over Rush Creek Relief in Tarrant County, Texas. It was built in 1958 and reconstructed in 2000, so it is 67 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,594 vehicles a day, roughly 5% of them trucks, projected to reach 28,600 by 2033. The structure is 209 ft (63.7 m) long and 122 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Spur 303 over Rush Creek Relief built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2000.
What condition is Spur 303 over Rush Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Spur 303 over Rush Creek Relief carry?
About 17,594 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Spur 303 over Rush Creek Relief?
The structure is 209 ft (63.7 m) long with a longest span of 42 ft (12.8 m) and a deck 122 ft wide.
Who owns Spur 303 over Rush Creek Relief?
It is owned by the State Highway Agency.