US Bridges

SH 360 SB to 30 EB over IH-30/SH 360 Interchange

Good

Tarrant County, Texas · 0.2 Mi. S. of Ave. J · Structure no. 022200106802566

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,929 ft
5 main spans
Daily traffic
7,600
2015 count
Owner
State
State Highway Agency

About this bridge

SH 360 SB to 30 EB over IH-30/SH 360 Interchange is a steel continuous stringer/multi-beam or girder carrying SH 360 SB to 30 EB over IH-30/SH 360 Interchange in Tarrant County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,600 vehicles a day, roughly 5% of them trucks, projected to reach 10,000 by 2035. The structure is 1,929 ft (588 m) long and 28 ft wide.

CarriesSH 360 SB to 30 EB
CrossesIH-30/SH 360 Interchange
Location0.2 Mi. S. of Ave. J
RouteState Highway 360
StateTexas
Coordinates32.76351, -97.0635
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans5 (+10 approach)
Design loadHL 93
Structure length1,929 ft (588 m)
Longest span205 ft (62.5 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck18 ft (5.4 m)

Traffic and service

Average daily traffic7,600 (2015)
Projected traffic10,000 by 2035
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 360 SB to 30 EB over IH-30/SH 360 Interchange built?

It was built in 2017, making it 8 years old in 2025.

What condition is SH 360 SB to 30 EB over IH-30/SH 360 Interchange in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SH 360 SB to 30 EB over IH-30/SH 360 Interchange carry?

About 7,600 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is SH 360 SB to 30 EB over IH-30/SH 360 Interchange?

The structure is 1,929 ft (588 m) long with a longest span of 205 ft (62.5 m) and a deck 28 ft wide.

Who owns SH 360 SB to 30 EB over IH-30/SH 360 Interchange?

It is owned by the State Highway Agency.